ACWA Power Zarqa CCGT Project
Project Info
Client:
Poyry
Contractor:
Sepcoiii Electric Power Construction Corporation
The scope of work involves construction of four-laning of a part of Ramban to Banihal Section of NH-1A (Now NH-44), from ch158.650 to ch 164.660 (North Bound) and ch 160.260 to 163.406 (South Bound connecting
Kattupalli Port is considered one of the largest shipyards in Asia, and it demanded exceptional quality concrete for its protective perimeter.
Keeping pace with the current requirement of Quality Construction for building up a high technology plant, DCP provided Admixture - Supalfo PC 360, Floor Hardener – Monoshake and Tile Adhesive – Cemfix GP.